RTS (Request Tracking System) is used for obtaining document approvals and for submitting document release Revising Procedures, Work Instructions, etc. (not drawings except for tooling) requests to Document Control. Send an e-mail to Doc Control and request the Source file. Make the changes per engineering request.
REQUEST TRACKING SYSTEM —» Product/folder —» Form Template folder (DCR form) —» download form abc_xxxyz (Document Change Request) and save it to hard drive —» ProductDoc Home —» Application Links tab —»
RTS: New Request —» Request Type (Internal Routing INTRT) —» Request Name (BVR Numbers) —» Business Unit (ADM – Aerospace, Defense & Marine) —» Request Description (Remove BUILD VARIANCE REQUEST Number from PLM.Tec (all versions) —» Save —» A number is assigned in the Request Box —» Fill out the form below —»
Form abc_xxxyz: enter Generated Request Number —» Requester (Name) —» Date —» Product Group or Functional Area (Devices) —» Document Type (BVR-Build Variance Request) —» Manufacturing Location (Santa Clara) —» Document Number (BVR Number) —» Document Title —» Nature of Request (obsolete) —» Rev From (All) —» Rev To (Rev) —» Reason for change (Remove BVR Number from PLM.Tec (all version) —» Save as (Document Title-Form) —» back to RTS —»
RTS: Attachments tab —» add New Attachment —» Date —» File Type (File System Attachments) —» File Category (NonRestricted – Other) —» File (Browse for the saved document.doc from hard drive) —» Save and Continue with Additional Attachments (the saved abc_xxxyz.doc) —» Save and No Additional Attachment —» Assign the request for approval —»
Assignments tab: select/check the box next to assignee name —» in One Time window (type in employee ID) —» in Comment window (type Review and Approve) —» Sub-Assign —» Repeat this step to add another —» Save —»
Wait for the approval from assignees then proceed to ASSIGNING the REQUEST to DOCUMENT CONTROL
My Inbox: Request (click on the request number) —» click the Assignment tab —» select/check the box next to assignee name —» In Distribution Lists (select ECOC_XYZ.doc — Review/Approval form) —» in Comment window (type Review and Approve) —» Sub-Assign —» Save (to close the request).
ECOC: (Electronic Cycle of Change): Adapted from a work by Prochaska & Diclemente | Ignacio Pacheco
RTS: My Inbox —» select the request Number —» Assignment tab —» click/check the box icon Comments (Reject by/reasons) —» Close
Your Support Can Help Us Grow. Thank you for visiting ViBa Direct. As part of our commitment to continually improving the visitor experience. I am writing to ask you for your support, such as listing your company here with us. Clearly there is a great deal of manufacturers and distributors including both mechanical and electrical. Unfortunately, I don't have enough manpower to meet everyone needs. But if you are interested in finding out how to support us. Please provide details about your products and reach out to Customer Service, as well as any offerings that you feel may meet customer needs. Thank you in advance for taking the time to read this. Feel free to contact us with any additional feedback you would like to share about your experience visiting ViBaDirect.com.